PaintDays

When to paint a house exterior in Steamboat Springs, CO

When to paint in Steamboat Springs, CO

Exterior painting here is a gamble in any month. The painting window is not reliable in any month, with 0 good months a year. The best month is July, at about 5 painting days.

If you cannot avoid the thin months, ask the painter for a low-temperature latex and watch the forecast for a dry run of 4 days before you commit. For a deck, the months with enough staining days to spare are Jul, Aug.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. under 1Apr
  5. under 1May
  6. 1Jun
  7. 5Jul
  8. 5Aug
  9. under 1Sep
  10. under 1Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 18° / 30°F
Februaryunder 1under 1under 111° / 34°F
Marchunder 1under 1under 119° / 44°F
Aprilunder 1under 1126° / 55°F
Mayunder 1under 11033° / 65°F
June112641° / 79°F
July552847° / 85°F
August552845° / 83°F
Septemberunder 1under 11938° / 77°F
Octoberunder 1under 1328° / 61°F
Novemberunder 1under 1under 119° / 46°F
Decemberunder 1under 1under 110° / 32°F

Deck stain does best in July. Low-temperature paint adds about 104 days a year here.

Towns near Steamboat Springs compared

3 of the 6 nearest places get more painting days, the most in Boulder (36 a year, 89 miles east). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom Steamboat SpringsPainting days a yearWindowStation
Glenwood Springs, CO70 mi southwest12none reliableGarfield County Regional Airport
Rifle, CO82 mi southwest12none reliableGarfield County Regional Airport
Laramie, WY86 mi northeast12none reliableLaramie Regional Airport
Boulder, CO89 mi east36June to AugustErie Municipal Airport
Fort Collins, CO92 mi east30August to SeptemberFort Collins Loveland Airport
Loveland, CO93 mi east30August to SeptemberFort Collins Loveland Airport

How Steamboat Springs ranks in CO

Of 53 CO places with 10,000 people or more, Steamboat Springs (population 13,620, 45th largest) ranks 51st for painting days, 24 days below the state median of 36. The longest season in the state is Cañon City, 71 days, 164 miles southeast. The shortest is Glenwood Springs at 12. Switching to low-temperature paint here is worth 104 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Steamboat Springs/Bob Adams F (3.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.