PaintDays

When to paint a house exterior in Statesville, NC

When to paint in Statesville, NC

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 15 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 3Mar
  4. 5Apr
  5. 12May
  6. 14Jun
  7. 6Jul
  8. 12Aug
  9. 15Sep
  10. 9Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1228° / 53°F
February1under 1533° / 58°F
March321039° / 66°F
April541746° / 74°F
May1291855° / 80°F
June14131463° / 87°F
July62668° / 91°F
August1281266° / 88°F
September15131761° / 84°F
October982249° / 75°F
November11937° / 64°F
Decemberunder 1under 1533° / 56°F

Deck stain does best in June. Low-temperature paint adds about 60 days a year here.

Towns near Statesville compared

2 of the 6 nearest places get more painting days, the most in Salisbury (95 a year, 23 miles east). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Mooresville is read from the same station as Statesville, so its numbers match; the real difference is the distance from that station.

PlaceFrom StatesvillePainting days a yearWindowStation
Mooresville, NC14 mi south78August to Septembersame station
Davidson, NC21 mi south80May to JuneLicontn-Lincoln County Rgnl Airport
Cornelius, NC21 mi south80May to JuneLicontn-Lincoln County Rgnl Airport
Newton, NC22 mi west77JuneHickory Regional Airport
Salisbury, NC23 mi east95May to JuneRowan County Airport
Kannapolis, NC24 mi southeast95May to JuneRowan County Airport

How Statesville ranks in NC

Of 91 NC places with 10,000 people or more, Statesville (population 31,693, 39th largest) ranks 45th for painting days, right at the state median of 77. The longest season in the state is Greenville, 123 days, 197 miles east. The shortest is Boone at 50. Switching to low-temperature paint here is worth 60 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Statesville Municipal Airport (4.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.