PaintDays

When to paint a house exterior in St. John, IN

When to paint in St. John, IN

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is July, at about 19 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 6May
  6. 12Jun
  7. 19Jul
  8. 18Aug
  9. 15Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1120° / 34°F
Februaryunder 1under 1123° / 41°F
Marchunder 1under 1331° / 49°F
April11839° / 61°F
May661350° / 71°F
June12101560° / 82°F
July19131964° / 84°F
August18141962° / 83°F
September15131957° / 78°F
October441345° / 65°F
November11634° / 52°F
Decemberunder 1under 1127° / 42°F

Deck stain does best in August. Low-temperature paint adds about 41 days a year here.

Towns near St. John compared

Every one of the 6 closest places lands within three days of St. John's 76 a year, so the season here is the regional season. Schererville, Dyer, Cedar Lake, Griffith, Crown Point, Highland are read from the same station as St. John, so their numbers match; the real difference is the distance from that station.

PlaceFrom St. JohnPainting days a yearWindowStation
Schererville, IN3 mi northeast76June to Septembersame station
Dyer, IN4 mi northwest76June to Septembersame station
Cedar Lake, IN5 mi south76June to Septembersame station
Griffith, IN6 mi north76June to Septembersame station
Crown Point, IN7 mi east76June to Septembersame station
Highland, IN7 mi north76June to Septembersame station

How St. John ranks in IN

Of 88 IN places with 10,000 people or more, St. John (population 24,250, 42nd largest) ranks 34th for painting days, 1 day above the state median of 75. The longest season in the state is Michigan City, 134 days, 36 miles northeast. The shortest is McCordsville at 59. Switching to low-temperature paint here is worth 41 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Lansing Municipal Airport (7.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.