PaintDays

When to paint a house exterior in Spring Lake, NC

When to paint in Spring Lake, NC

A short season: book early and expect weather delays. The painting window is April to June, and even that is thin, with 0 good months a year. The best month is May, at about 12 painting days. Book a painter by February.

If you want the house done in April to June, call for quotes in February or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Sep, Oct.

  1. 1Jan
  2. 2Feb
  3. 4Mar
  4. 9Apr
  5. 12May
  6. 9Jun
  7. 3Jul
  8. 7Aug
  9. 11Sep
  10. 11Oct
  11. 2Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1432° / 57°F
February22737° / 63°F
March441242° / 69°F
April971850° / 78°F
May1271559° / 84°F
June96967° / 90°F
July31372° / 93°F
August73770° / 91°F
September11101365° / 86°F
October1192252° / 78°F
November221141° / 68°F
December11436° / 61°F

Deck stain does best in September. Low-temperature paint adds about 53 days a year here.

Towns near Spring Lake compared

2 of the 6 nearest places get more painting days, the most in Fuquay-Varina (79 a year, 32 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom Spring LakePainting days a yearWindowStation
Fayetteville, NC7 mi south69April to JuneSimmons Army Airfield Airport
Hope Mills, NC15 mi south72OctoberFayett Rgnl/Grannis Field Airport
Southern Pines, NC23 mi west73MayMoore County Airport
Sanford, NC24 mi northwest76JuneSanford-Lee County Rgnl Airport
Pinehurst, NC27 mi west73MayMoore County Airport
Fuquay-Varina, NC32 mi northeast79MayHarnett County Airport

How Spring Lake ranks in NC

Of 91 NC places with 10,000 people or more, Spring Lake (population 11,530, 84th largest) ranks 67th for painting days, 7 days below the state median of 77. The longest season in the state is Greenville, 123 days, 96 miles east. The shortest is Boone at 50. Switching to low-temperature paint here is worth 53 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Pope Air Force Base Airport (1.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.