PaintDays

When to paint a house exterior in Southbridge Town, MA

When to paint in Southbridge Town, MA

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is August, at about 17 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. under 1Apr
  5. 6May
  6. 14Jun
  7. 16Jul
  8. 17Aug
  9. 14Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 119° / 37°F
Februaryunder 1under 1under 119° / 40°F
Marchunder 1under 1226° / 47°F
Aprilunder 1under 1836° / 58°F
May641747° / 70°F
June14101756° / 78°F
July1671663° / 83°F
August17111762° / 81°F
September14121855° / 74°F
October331444° / 63°F
November11633° / 52°F
Decemberunder 1under 1125° / 42°F

Deck stain does best in September. Low-temperature paint adds about 43 days a year here.

Towns near Southbridge Town compared

5 get fewer, down to 42 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Worcester is read from the same station as Southbridge Town, so its numbers match; the real difference is the distance from that station.

PlaceFrom Southbridge TownPainting days a yearWindowStation
Palmer Town, MA17 mi northwest42AugustWestover Air Force Base/Metropolitan Air
Worcester, MA19 mi northeast72June to Septembersame station
Springfield, MA26 mi west42AugustWestover Air Force Base/Metropolitan Air
Woonsocket, RI28 mi east62June to AugustNorth Central State Airport
Chicopee, MA29 mi west42AugustWestover Air Force Base/Metropolitan Air
Agawam Town, MA32 mi west46AugustBarnes Municipal Airport

How Southbridge Town ranks in MA

Of 58 MA places with 10,000 people or more, Southbridge Town (population 18,106, 53rd largest) ranks 15th for painting days, 13 days above the state median of 60. The longest season in the state is Boston, 74 days, 55 miles east. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Worcester Regional Airport (16.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.