PaintDays

When to paint a house exterior in South Burlington, VT

When to paint in South Burlington, VT

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 15 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 9Jun
  7. 12Jul
  8. 15Aug
  9. 12Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 114° / 33°F
Februaryunder 1under 1115° / 35°F
Marchunder 1under 1224° / 45°F
April11635° / 59°F
May551647° / 74°F
June961256° / 81°F
July1251262° / 86°F
August1571561° / 83°F
September12101954° / 77°F
October331243° / 64°F
November11431° / 49°F
Decemberunder 1under 1123° / 40°F

Deck stain does best in September. Low-temperature paint adds about 41 days a year here.

Towns near South Burlington compared

4 get fewer, down to 40 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Burlington, Essex Junction are read from the same station as South Burlington, so their numbers match; the real difference is the distance from that station.

PlaceFrom South BurlingtonPainting days a yearWindowStation
Burlington, VT5 mi northwest58July to Septembersame station
Essex Junction, VT5 mi northeast58July to Septembersame station
Plattsburgh, NY22 mi northwest47July to AugustPlattsburgh International Air
Rutland, VT58 mi south52July to AugustRutland State Airport
Lebanon, NH72 mi southeast40July to SeptemberLebanon Municipal Airport
Glens Falls, NY81 mi south42June to AugustFloyd Bennett Memo Airport

How South Burlington ranks in VT

Of 4 VT places with 10,000 people or more, South Burlington (population 21,713, 2nd largest) ranks 2nd for painting days, right at the state median of 58. The longest season in the state is Burlington, 58 days, 5 miles northwest. The shortest is Rutland at 52. Switching to low-temperature paint here is worth 41 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Burlington International Airport (2.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.