PaintDays

When to paint a house exterior in Somerville, MA

When to paint in Somerville, MA

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 15 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 8May
  6. 15Jun
  7. 12Jul
  8. 15Aug
  9. 15Sep
  10. 8Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1124° / 42°F
Februaryunder 1under 1224° / 44°F
Marchunder 1under 1330° / 49°F
April1under 11240° / 59°F
May871650° / 71°F
June1591559° / 79°F
July1281266° / 86°F
August1591566° / 85°F
September15111759° / 77°F
October881749° / 67°F
November111037° / 56°F
Decemberunder 1under 1230° / 47°F

Deck stain does best in September. Low-temperature paint adds about 48 days a year here.

Towns near Somerville compared

Every one of the 6 closest places lands within three days of Somerville's 74 a year, so the season here is the regional season. Cambridge, Medford, Everett, Malden, Chelsea, Watertown are read from the same station as Somerville, so their numbers match; the real difference is the distance from that station.

PlaceFrom SomervillePainting days a yearWindowStation
Cambridge, MA1 mi southwest74August to Septembersame station
Medford, MA2 mi north74August to Septembersame station
Everett, MA3 mi northeast74August to Septembersame station
Malden, MA3 mi northeast74August to Septembersame station
Chelsea, MA4 mi east74August to Septembersame station
Watertown, MA4 mi west74August to Septembersame station

How Somerville ranks in MA

Of 58 MA places with 10,000 people or more, Somerville (population 82,149, 13th largest) ranks 4th for painting days, 15 days above the state median of 60. The longest season in the state is Boston, 74 days, 6 miles southeast. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Gen E L Logan International A (5.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.