PaintDays

When to paint a house exterior in Shorewood, IL

When to paint in Shorewood, IL

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 16 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 7May
  6. 10Jun
  7. 15Jul
  8. 16Aug
  9. 14Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 121° / 35°F
Februaryunder 1under 1223° / 42°F
Marchunder 1under 1433° / 52°F
April22941° / 64°F
May751452° / 75°F
June1081262° / 85°F
July1591665° / 86°F
August16111763° / 84°F
September14111858° / 80°F
October441446° / 67°F
November11634° / 53°F
Decemberunder 1under 1128° / 43°F

Deck stain does best in August. Low-temperature paint adds about 43 days a year here.

Towns near Shorewood compared

3 of the 6 nearest places get more painting days, the most in Crest Hill (74 a year, 7 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Joliet, Minooka, Channahon are read from the same station as Shorewood, so their numbers match; the real difference is the distance from that station.

PlaceFrom ShorewoodPainting days a yearWindowStation
Joliet, IL3 mi east69July to Septembersame station
Minooka, IL6 mi southwest69July to Septembersame station
Crest Hill, IL7 mi northeast74July to SeptemberLewis University Airport
Channahon, IL7 mi south69July to Septembersame station
Plainfield, IL7 mi north74July to SeptemberLewis University Airport
Romeoville, IL10 mi northeast74July to SeptemberLewis University Airport

How Shorewood ranks in IL

Of 225 IL places with 10,000 people or more, Shorewood (population 18,522, 136th largest) ranks 214th for painting days, 8 days below the state median of 77. The longest season in the state is Chicago, 131 days, 35 miles northeast. The shortest is Woodstock at 65. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Joliet Regional Airport (2.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.