PaintDays

When to paint a house exterior in Shepherdsville, KY

When to paint in Shepherdsville, KY

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is September, at about 13 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 2Mar
  4. 5Apr
  5. 12May
  6. 11Jun
  7. 7Jul
  8. 12Aug
  9. 13Sep
  10. 10Oct
  11. 2Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1328° / 47°F
February1under 1431° / 54°F
March21839° / 63°F
April531447° / 73°F
May1271558° / 81°F
June1181166° / 88°F
July74771° / 91°F
August1291269° / 90°F
September13131363° / 86°F
October1082151° / 75°F
November221139° / 61°F
December11534° / 54°F

Deck stain does best in September. Low-temperature paint adds about 49 days a year here.

Towns near Shepherdsville compared

1 of the 6 nearest places get more painting days, the most in Bardstown (124 a year, 18 miles southeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Mount Washington, Shively are read from the same station as Shepherdsville, so their numbers match; the real difference is the distance from that station.

PlaceFrom ShepherdsvillePainting days a yearWindowStation
Mount Washington, KY9 mi northeast76Maysame station
Louisville/Jefferson County, KY13 mi north75August to SeptemberBowman Field Airport
Shively, KY16 mi north76Maysame station
Radcliff, KY17 mi southwest74August to SeptemberGodman Army Airfield Airport
Jeffersontown, KY17 mi northeast75August to SeptemberBowman Field Airport
Bardstown, KY18 mi southeast124May to SeptemberSamuels Field / Bardstown

How Shepherdsville ranks in KY

Of 42 KY places with 10,000 people or more, Shepherdsville (population 14,837, 31st largest) ranks 20th for painting days, 2 days above the state median of 75. The longest season in the state is Campbellsville, 145 days, 48 miles southeast. The shortest is Glasgow at 58. Switching to low-temperature paint here is worth 49 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Louisville International-Standiford Fi (13.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.