PaintDays

When to paint a house exterior in San Luis, AZ

When to paint in San Luis, AZ

A normal season: plan the job, do not leave it late. The painting window is March to April, with 3 good months a year. The best month is March, at about 18 painting days. Book a painter by January.

If you want the house done in March to April, call for quotes in January or earlier; a job pushed past April is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, Oct, Nov, Dec.

  1. 7Jan
  2. 9Feb
  3. 18Mar
  4. 13Apr
  5. 7May
  6. under 1Jun
  7. under 1Jul
  8. under 1Aug
  9. 1Sep
  10. 11Oct
  11. 18Nov
  12. 6Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January732846° / 72°F
February982747° / 75°F
March18162653° / 81°F
April13121459° / 90°F
May74764° / 95°F
Juneunder 1under 1under 174° / 105°F
Julyunder 1under 1under 183° / 110°F
Augustunder 1under 1under 183° / 109°F
September1under 1177° / 104°F
October11111264° / 93°F
November18152753° / 81°F
December652946° / 72°F

Deck stain does best in March. Low-temperature paint adds about 80 days a year here.

Towns near San Luis compared

4 get fewer, down to 56 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Somerton, Yuma are read from the same station as San Luis, so their numbers match; the real difference is the distance from that station.

PlaceFrom San LuisPainting days a yearWindowStation
Somerton, AZ8 mi north89March to Aprilsame station
Yuma, AZ12 mi east89March to Aprilsame station
Calexico, CA47 mi west56March to MayImperial County Airport
El Centro, CA53 mi northwest56March to MayImperial County Airport
Imperial, CA55 mi northwest56March to MayImperial County Airport
Brawley, CA58 mi northwest56March to MayImperial County Airport

How San Luis ranks in AZ

Of 44 AZ places with 10,000 people or more, San Luis (population 40,064, 27th largest) ranks 10th for painting days, 14 days above the state median of 75. The longest season in the state is Bullhead City, 124 days, 183 miles north. The shortest is Show Low at 15. Switching to low-temperature paint here is worth 80 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Yuma Mcas (12.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.