PaintDays

When to paint a house exterior in San Juan, TX

When to paint in San Juan, TX

A normal season: plan the job, do not leave it late. The painting window is November to March, with 5 good months a year. The best month is March, at about 17 painting days. Book a painter by September.

If you want the house done in November to March, call for quotes in September or earlier; a job pushed past March is likely to wait until next year. For a deck, the months with enough staining days to spare are Jan, Feb, Mar, Apr, Oct, Nov, Dec.

  1. 13Jan
  2. 14Feb
  3. 17Mar
  4. 12Apr
  5. 4May
  6. under 1Jun
  7. under 1Jul
  8. under 1Aug
  9. 1Sep
  10. 6Oct
  11. 16Nov
  12. 16Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January13132252° / 74°F
February14131856° / 79°F
March17171964° / 85°F
April12111269° / 90°F
May43475° / 94°F
Juneunder 1under 1under 178° / 97°F
Julyunder 1under 1under 179° / 99°F
Augustunder 1under 1under 179° / 101°F
September11176° / 97°F
October66769° / 91°F
November16151762° / 82°F
December16162357° / 78°F

Deck stain does best in March. Low-temperature paint adds about 24 days a year here.

Towns near San Juan compared

1 of the 6 nearest places get more painting days, the most in Donna (109 a year, 7 miles east); 1 gets fewer, down to 88 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Alamo, Pharr, McAllen, Hidalgo are read from the same station as San Juan, so their numbers match; the real difference is the distance from that station.

PlaceFrom San JuanPainting days a yearWindowStation
Alamo, TX2 mi east99November to Marchsame station
Pharr, TX3 mi southwest99November to Marchsame station
McAllen, TX6 mi northwest99November to Marchsame station
Donna, TX7 mi east109February to AprilMid Valley Airport
Hidalgo, TX8 mi southwest99November to Marchsame station
Edinburg, TX9 mi north88November to DecemberEdinburg International Airport

How San Juan ranks in TX

Of 252 TX places with 10,000 people or more, San Juan (population 37,341, 103rd largest) ranks 57th for painting days, 11 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 301 miles northeast. The shortest is Town of Pecos at 38. Low-temperature paint only adds 24 days here, so the season is set by heat, rain or dew rather than cold nights.

Where these numbers come from

Daily records from Mc Allen Miller International Airport (6.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.