PaintDays

When to paint a house exterior in Salinas, CA

When to paint in Salinas, CA

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is July, at about 30 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Jul, Aug, Sep, Oct.

  1. 1Jan
  2. 1Feb
  3. 2Mar
  4. 7Apr
  5. 19May
  6. 26Jun
  7. 30Jul
  8. 29Aug
  9. 23Sep
  10. 11Oct
  11. 3Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January111843° / 65°F
February1under 11842° / 67°F
March211944° / 68°F
April772447° / 70°F
May19162851° / 70°F
June26252854° / 74°F
July30303056° / 73°F
August29292957° / 75°F
September23232455° / 78°F
October11112450° / 78°F
November332344° / 71°F
December1under 11841° / 64°F

Deck stain does best in July. Low-temperature paint adds about 129 days a year here.

Towns near Salinas compared

6 get fewer, down to 80 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom SalinasPainting days a yearWindowStation
Marina, CA9 mi west128May to OctoberMonterey Peninsula Airport
Seaside, CA11 mi southwest128May to OctoberMonterey Peninsula Airport
Monterey, CA15 mi southwest128May to OctoberMonterey Peninsula Airport
Pacific Grove, CA17 mi west128May to OctoberMonterey Peninsula Airport
Hollister, CA17 mi northeast126May to SeptemberHollister Municipal Airport
Watsonville, CA18 mi northwest80June to SeptemberWatsonville Municipal Airport

How Salinas ranks in CA

Of 376 CA places with 10,000 people or more, Salinas (population 160,783, 35th largest) ranks 173rd for painting days, 25 days above the state median of 128. The longest season in the state is Santa Clarita, 269 days, 236 miles southeast. The shortest is Susanville at 4. Switching to low-temperature paint here is worth 129 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Salinas Municipal Airport (2.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.