PaintDays

When to paint a house exterior in Rosenberg, TX

When to paint in Rosenberg, TX

A normal season: plan the job, do not leave it late. The painting window is March to May, with 5 good months a year. The best month is April, at about 18 painting days. Book a painter by January.

If you want the house done in March to May, call for quotes in January or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Jan, Feb, Mar, Apr, May, Oct, Nov, Dec.

  1. 5Jan
  2. 7Feb
  3. 15Mar
  4. 18Apr
  5. 13May
  6. 3Jun
  7. 1Jul
  8. under 1Aug
  9. 5Sep
  10. 15Oct
  11. 12Nov
  12. 7Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January551546° / 66°F
February761550° / 71°F
March15122057° / 77°F
April18161962° / 82°F
May13101370° / 88°F
June31375° / 93°F
July11176° / 95°F
Augustunder 1under 1under 176° / 96°F
September54572° / 92°F
October15141663° / 85°F
November12111855° / 75°F
December771750° / 70°F

Deck stain does best in April. Low-temperature paint adds about 41 days a year here.

Towns near Rosenberg compared

1 gets fewer, down to 67 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Richmond, Fulshear, Sugar Land, Stafford, Katy are read from the same station as Rosenberg, so their numbers match; the real difference is the distance from that station.

PlaceFrom RosenbergPainting days a yearWindowStation
Richmond, TX4 mi northeast100March to Maysame station
Fulshear, TX11 mi north100March to Maysame station
Sugar Land, TX12 mi east100March to Maysame station
Stafford, TX16 mi east100March to Maysame station
Katy, TX17 mi north100March to Maysame station
Missouri City, TX17 mi east67OctoberHouston Southwest Airport

How Rosenberg ranks in TX

Of 252 TX places with 10,000 people or more, Rosenberg (population 42,571, 88th largest) ranks 49th for painting days, 11 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 41 miles east. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 41 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Sugar Land Regional Airport (11.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.