PaintDays

When to paint a house exterior in Redmond, WA

When to paint in Redmond, WA

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is July, at about 26 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 13May
  6. 19Jun
  7. 26Jul
  8. 26Aug
  9. 18Sep
  10. 4Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1236° / 50°F
Februaryunder 1under 1536° / 51°F
Marchunder 1under 1938° / 56°F
April211543° / 62°F
May1372249° / 70°F
June19162154° / 75°F
July26242659° / 81°F
August26222659° / 81°F
September18182254° / 74°F
October441446° / 63°F
Novemberunder 1under 1440° / 54°F
Decemberunder 1under 1236° / 49°F

Deck stain does best in July. Low-temperature paint adds about 60 days a year here.

Towns near Redmond compared

5 get fewer, down to 92 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Kirkland is read from the same station as Redmond, so its numbers match; the real difference is the distance from that station.

PlaceFrom RedmondPainting days a yearWindowStation
Kirkland, WA4 mi west108May to Septembersame station
Woodinville, WA6 mi north92June to SeptemberSnohomish County (Paine Fd) Airport
Bellevue, WA6 mi south104May to SeptemberRenton Municipal Airport
Sammamish, WA7 mi southeast104May to SeptemberRenton Municipal Airport
Bothell, WA8 mi northwest92June to SeptemberSnohomish County (Paine Fd) Airport
Kenmore, WA8 mi northwest92June to SeptemberSnohomish County (Paine Fd) Airport

How Redmond ranks in WA

Of 91 WA places with 10,000 people or more, Redmond (population 82,195, 16th largest) ranks 3rd for painting days, 37 days above the state median of 71. The longest season in the state is Seattle, 108 days, 12 miles west. The shortest is Sunnyside at 27. Switching to low-temperature paint here is worth 60 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Boeing Field/King County International Airport (13.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.