PaintDays

When to paint a house exterior in Princeton, TX

When to paint in Princeton, TX

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is May, at about 15 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 1Jan
  2. 4Feb
  3. 8Mar
  4. 12Apr
  5. 15May
  6. 6Jun
  7. 2Jul
  8. 2Aug
  9. 8Sep
  10. 14Oct
  11. 6Nov
  12. 3Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11835° / 57°F
February441239° / 61°F
March871748° / 70°F
April12111954° / 76°F
May1591663° / 83°F
June64671° / 91°F
July21275° / 96°F
August21274° / 96°F
September88868° / 90°F
October14141956° / 81°F
November661646° / 68°F
December331240° / 61°F

Deck stain does best in October. Low-temperature paint adds about 56 days a year here.

Towns near Princeton compared

1 of the 6 nearest places get more painting days, the most in Wylie (90 a year, 11 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Fairview, Melissa, McKinney, Allen, Anna are read from the same station as Princeton, so their numbers match; the real difference is the distance from that station.

PlaceFrom PrincetonPainting days a yearWindowStation
Fairview, TX7 mi southwest81Maysame station
Melissa, TX8 mi north81Maysame station
McKinney, TX9 mi west81Maysame station
Wylie, TX11 mi south90April to MayRalph M Hall Rockwall Municip
Allen, TX11 mi southwest81Maysame station
Anna, TX12 mi north81Maysame station

How Princeton ranks in TX

Of 252 TX places with 10,000 people or more, Princeton (population 37,019, 104th largest) ranks 167th for painting days, 8 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 257 miles south. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 56 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Mckinney Municipal Airport (4.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.