PaintDays

When to paint a house exterior in Palm Bay, FL

When to paint in Palm Bay, FL

A long painting season, with room to reschedule. The painting window is February to May, with 6 good months a year. The best month is March, at about 20 painting days. Book a painter by December.

If you want the house done in February to May, call for quotes in December or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Jan, Feb, Mar, Apr, May, Jun, Sep, Oct, Nov, Dec.

  1. 8Jan
  2. 12Feb
  3. 20Mar
  4. 19Apr
  5. 17May
  6. 8Jun
  7. 3Jul
  8. 4Aug
  9. 9Sep
  10. 17Oct
  11. 16Nov
  12. 12Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January881752° / 75°F
February1291855° / 78°F
March20192359° / 82°F
April19152064° / 84°F
May17141769° / 87°F
June84873° / 90°F
July33375° / 92°F
August44476° / 92°F
September95975° / 90°F
October17141770° / 86°F
November16101863° / 81°F
December1281857° / 78°F

Deck stain does best in March. Low-temperature paint adds about 28 days a year here.

Towns near Palm Bay compared

3 of the 6 nearest places get more painting days, the most in Satellite Beach (165 a year, 16 miles north); 1 gets fewer, down to 137 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. West Melbourne, Melbourne are read from the same station as Palm Bay, so their numbers match; the real difference is the distance from that station.

PlaceFrom Palm BayPainting days a yearWindowStation
West Melbourne, FL7 mi north145February to Maysame station
Melbourne, FL11 mi north145February to Maysame station
Satellite Beach, FL16 mi north165January to MayPatrick Air Force Base Airport
Sebastian, FL16 mi southeast137February to MayVero Beach Municipal Airport
Rockledge, FL26 mi north165January to MayPatrick Air Force Base Airport
Cocoa Beach, FL26 mi north165January to MayPatrick Air Force Base Airport

How Palm Bay ranks in FL

Of 173 FL places with 10,000 people or more, Palm Bay (population 142,023, 15th largest) ranks 71st for painting days, 1 day above the state median of 145. The longest season in the state is North Port, 226 days, 113 miles southwest. The shortest is Crestview at 69. Low-temperature paint only adds 28 days here, so the season is set by heat, rain or dew rather than cold nights.

Where these numbers come from

Daily records from Melbourne International Airport (10.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.