PaintDays

When to paint a house exterior in Oshkosh, WI

When to paint in Oshkosh, WI

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is July, at about 20 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 7May
  6. 14Jun
  7. 20Jul
  8. 19Aug
  9. 15Sep
  10. 4Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 115° / 28°F
Februaryunder 1under 1114° / 32°F
Marchunder 1under 1226° / 43°F
April11836° / 56°F
May751548° / 70°F
June14101659° / 79°F
July20142062° / 83°F
August19151961° / 80°F
September15131855° / 75°F
October441443° / 61°F
Novemberunder 1under 1631° / 47°F
Decemberunder 1under 1122° / 35°F

Deck stain does best in August. Low-temperature paint adds about 41 days a year here.

Towns near Oshkosh compared

5 of the 6 nearest places get more painting days, the most in Neenah (111 a year, 11 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom OshkoshPainting days a yearWindowStation
Neenah, WI11 mi northeast111June to SeptemberOutagamie County Rgnl Airport
Fox Crossing, WI14 mi north111June to SeptemberOutagamie County Rgnl Airport
Menasha, WI15 mi northeast111June to SeptemberOutagamie County Rgnl Airport
Harrison, WI18 mi northeast111June to SeptemberOutagamie County Rgnl Airport
Greenville, WI18 mi north111June to SeptemberOutagamie County Rgnl Airport
Fond du Lac, WI18 mi south77June to SeptemberFond Du Lac County Airport

How Oshkosh ranks in WI

Of 98 WI places with 10,000 people or more, Oshkosh (population 67,242, 9th largest) ranks 15th for painting days, 9 days above the state median of 69. The longest season in the state is Appleton, 111 days, 20 miles northeast. The shortest is Superior at 29. Switching to low-temperature paint here is worth 41 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Whittman Regional Airport (2.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.