PaintDays

When to paint a house exterior in New Kensington, PA

When to paint in New Kensington, PA

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is August, at about 17 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 3Apr
  5. 8May
  6. 13Jun
  7. 15Jul
  8. 17Aug
  9. 16Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1123° / 40°F
Februaryunder 1under 1325° / 46°F
March1under 1432° / 55°F
April32941° / 66°F
May861352° / 75°F
June13101559° / 82°F
July1591564° / 86°F
August17111763° / 84°F
September16131858° / 79°F
October441546° / 68°F
November11734° / 55°F
Decemberunder 1under 1229° / 46°F

Deck stain does best in September. Low-temperature paint adds about 41 days a year here.

Towns near New Kensington compared

1 gets fewer, down to 63 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Plum, Monroeville, Murrysville, Wilkinsburg, Munhall are read from the same station as New Kensington, so their numbers match; the real difference is the distance from that station.

PlaceFrom New KensingtonPainting days a yearWindowStation
Lower Burrell, PA2 mi east63July to AugustBtlr County/K W Scholter Fd Airport
Plum, PA5 mi south79June to Septembersame station
Monroeville, PA10 mi south79June to Septembersame station
Murrysville, PA10 mi southeast79June to Septembersame station
Wilkinsburg, PA11 mi southwest79June to Septembersame station
Munhall, PA15 mi southwest79June to Septembersame station

How New Kensington ranks in PA

Of 68 PA places with 10,000 people or more, New Kensington (population 11,877, 57th largest) ranks 17th for painting days, 14 days above the state median of 65. The longest season in the state is Indiana, 109 days, 32 miles east. The shortest is St. Marys at 39. Switching to low-temperature paint here is worth 41 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Allegheny County Airport (17.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.