PaintDays

When to paint a house exterior in Murphy, TX

When to paint in Murphy, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 16 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 10Mar
  4. 14Apr
  5. 16May
  6. 5Jun
  7. 2Jul
  8. 1Aug
  9. 9Sep
  10. 16Oct
  11. 8Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221238° / 58°F
February441241° / 61°F
March1081850° / 71°F
April14111955° / 76°F
May16111665° / 84°F
June53572° / 92°F
July21275° / 96°F
August11175° / 96°F
September99969° / 90°F
October16161958° / 80°F
November881848° / 68°F
December441544° / 63°F

Deck stain does best in October. Low-temperature paint adds about 55 days a year here.

Towns near Murphy compared

1 of the 6 nearest places get more painting days, the most in Richardson (142 a year, 7 miles southwest); 1 gets fewer, down to 81 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Sachse, Wylie, Garland, Rowlett are read from the same station as Murphy, so their numbers match; the real difference is the distance from that station.

PlaceFrom MurphyPainting days a yearWindowStation
Sachse, TX4 mi southeast90April to Maysame station
Wylie, TX5 mi east90April to Maysame station
Richardson, TX7 mi southwest142March to MayAddison Airport
Allen, TX7 mi northwest81MayMckinney Municipal Airport
Garland, TX7 mi south90April to Maysame station
Rowlett, TX8 mi southeast90April to Maysame station

How Murphy ranks in TX

Of 252 TX places with 10,000 people or more, Murphy (population 21,109, 147th largest) ranks 122nd for painting days, 2 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 248 miles south. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 55 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Ralph M Hall Rockwall Municip (11.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.