PaintDays

When to paint a house exterior in Mount Vernon, WA

When to paint in Mount Vernon, WA

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is July, at about 26 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 8May
  6. 16Jun
  7. 26Jul
  8. 22Aug
  9. 12Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1837° / 48°F
Februaryunder 1under 1636° / 48°F
Marchunder 1under 11439° / 54°F
April212343° / 60°F
May872447° / 67°F
June16132451° / 71°F
July26232854° / 77°F
August22162454° / 78°F
September12121851° / 71°F
October431145° / 61°F
November1under 1740° / 52°F
Decemberunder 1under 1636° / 46°F

Deck stain does best in July. Low-temperature paint adds about 101 days a year here.

Towns near Mount Vernon compared

4 get fewer, down to 57 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Burlington, Sedro-Woolley are read from the same station as Mount Vernon, so their numbers match; the real difference is the distance from that station.

PlaceFrom Mount VernonPainting days a yearWindowStation
Burlington, WA3 mi north91June to Septembersame station
Sedro-Woolley, WA7 mi northeast91June to Septembersame station
Anacortes, WA15 mi west64July to AugustPadilla Bay Reserve
Oak Harbor, WA17 mi southwest70July to AugustWhidbey Island Naval Air Station
Arlington, WA19 mi southeast57July to AugustArlington Municipal Airport
Bellingham, WA24 mi north69July to AugustBellingham International Airport

How Mount Vernon ranks in WA

Of 91 WA places with 10,000 people or more, Mount Vernon (population 35,344, 35th largest) ranks 36th for painting days, 21 days above the state median of 71. The longest season in the state is Seattle, 108 days, 55 miles south. The shortest is Sunnyside at 27. Switching to low-temperature paint here is worth 101 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Skagit Regional Airport (5.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.