PaintDays

When to paint a house exterior in Minnetonka, MN

When to paint in Minnetonka, MN

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is July, at about 17 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 9May
  6. 14Jun
  7. 17Jul
  8. 17Aug
  9. 15Sep
  10. 6Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 111° / 26°F
Februaryunder 1under 1111° / 29°F
Marchunder 1under 1426° / 44°F
April211137° / 57°F
May981751° / 73°F
June1491562° / 83°F
July17121765° / 85°F
August17111763° / 82°F
September15141957° / 77°F
October661543° / 61°F
November11630° / 45°F
Decemberunder 1under 1under 118° / 32°F

Deck stain does best in September. Low-temperature paint adds about 42 days a year here.

Towns near Minnetonka compared

4 get fewer, down to 71 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Hopkins, Eden Prairie are read from the same station as Minnetonka, so their numbers match; the real difference is the distance from that station.

PlaceFrom MinnetonkaPainting days a yearWindowStation
Hopkins, MN3 mi east80June to Septembersame station
St. Louis Park, MN5 mi east71June to SeptemberCrystal Airport
Edina, MN6 mi southeast73June to SeptemberMinneapolis-St Paul Internati
Eden Prairie, MN6 mi south80June to Septembersame station
Plymouth, MN6 mi north71June to SeptemberCrystal Airport
Golden Valley, MN6 mi northeast71June to SeptemberCrystal Airport

How Minnetonka ranks in MN

Of 103 MN places with 10,000 people or more, Minnetonka (population 52,651, 19th largest) ranks 17th for painting days, 7 days above the state median of 73. The longest season in the state is Owatonna, 100 days, 59 miles south. The shortest is Hibbing at 23. Switching to low-temperature paint here is worth 42 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Flying Cloud Airport (7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.