PaintDays

When to paint a house exterior in Methuen, MA

When to paint in Methuen, MA

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is August, at about 15 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 6May
  6. 13Jun
  7. 13Jul
  8. 15Aug
  9. 12Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1121° / 40°F
Februaryunder 1under 1120° / 42°F
Marchunder 1under 1327° / 49°F
April1under 1937° / 61°F
May641847° / 73°F
June1381656° / 81°F
July1371364° / 87°F
August15101562° / 85°F
September1271855° / 78°F
October441644° / 67°F
November11733° / 55°F
Decemberunder 1under 1126° / 45°F

Deck stain does best in August. Low-temperature paint adds about 53 days a year here.

Towns near Methuen compared

1 gets fewer, down to 56 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Lawrence, Haverhill, Lowell, Amesbury, Newburyport are read from the same station as Methuen, so their numbers match; the real difference is the distance from that station.

PlaceFrom MethuenPainting days a yearWindowStation
Lawrence, MA3 mi south64June to Septembersame station
Haverhill, MA5 mi northeast64June to Septembersame station
Lowell, MA10 mi southwest64June to Septembersame station
Amesbury, MA14 mi northeast64June to Septembersame station
Newburyport, MA16 mi east64June to Septembersame station
Nashua, NH16 mi west56JuneBoire Field Airport

How Methuen ranks in MA

Of 58 MA places with 10,000 people or more, Methuen (population 54,272, 24th largest) ranks 19th for painting days, 4 days above the state median of 60. The longest season in the state is Boston, 74 days, 29 miles south. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 53 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Lawrence Municipal Airport (3.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.