PaintDays

When to paint a house exterior in Manvel, TX

When to paint in Manvel, TX

A short season: book early and expect weather delays. The painting window is October, with 1 good month a year. The best month is October, at about 12 painting days. Book a painter by August.

If you want the house done in October, call for quotes in August or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Oct, Nov.

  1. 2Jan
  2. 3Feb
  3. 10Mar
  4. 11Apr
  5. 11May
  6. 3Jun
  7. under 1Jul
  8. under 1Aug
  9. 3Sep
  10. 12Oct
  11. 8Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January211144° / 65°F
February331248° / 68°F
March1081755° / 76°F
April1161559° / 80°F
May1161268° / 87°F
June31373° / 92°F
Julyunder 1under 1under 174° / 94°F
Augustunder 1under 1under 174° / 95°F
September33471° / 91°F
October12101462° / 83°F
November881652° / 73°F
December221249° / 70°F

Deck stain does best in October. Low-temperature paint adds about 50 days a year here.

Towns near Manvel compared

4 of the 6 nearest places get more painting days, the most in South Houston (109 a year, 14 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Iowa Colony, Missouri City are read from the same station as Manvel, so their numbers match; the real difference is the distance from that station.

PlaceFrom ManvelPainting days a yearWindowStation
Iowa Colony, TX5 mi southwest67Octobersame station
Pearland, TX5 mi northeast108March to MayClover Field Airport
Alvin, TX10 mi southeast108March to MayClover Field Airport
Friendswood, TX10 mi east108March to MayClover Field Airport
Missouri City, TX12 mi northwest67Octobersame station
South Houston, TX14 mi northeast109March to MayWilliam P. Hobby Airport

How Manvel ranks in TX

Of 252 TX places with 10,000 people or more, Manvel (population 19,309, 160th largest) ranks 232nd for painting days, 22 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 17 miles northeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Houston Southwest Airport (6.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.