PaintDays

When to paint a house exterior in Loves Park, IL

When to paint in Loves Park, IL

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 18 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 10Jun
  7. 17Jul
  8. 18Aug
  9. 13Sep
  10. 4Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 116° / 33°F
Februaryunder 1under 1116° / 38°F
Marchunder 1under 1328° / 51°F
April11937° / 63°F
May531449° / 75°F
June1071359° / 85°F
July17101763° / 86°F
August18151961° / 85°F
September13111955° / 80°F
October441442° / 67°F
November11530° / 51°F
Decemberunder 1under 1123° / 41°F

Deck stain does best in August. Low-temperature paint adds about 43 days a year here.

Towns near Loves Park compared

1 of the 6 nearest places get more painting days, the most in Janesville (96 a year, 24 miles north). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Machesney Park, Roscoe, Rockford, Belvidere, Beloit are read from the same station as Loves Park, so their numbers match; the real difference is the distance from that station.

PlaceFrom Loves ParkPainting days a yearWindowStation
Machesney Park, IL2 mi northwest69July to Septembersame station
Roscoe, IL6 mi north69July to Septembersame station
Rockford, IL6 mi southwest69July to Septembersame station
Belvidere, IL8 mi southeast69July to Septembersame station
Beloit, WI13 mi north69July to Septembersame station
Janesville, WI24 mi north96June to SeptemberMonroe Municipal Airport

How Loves Park ranks in IL

Of 225 IL places with 10,000 people or more, Loves Park (population 23,636, 99th largest) ranks 210th for painting days, 8 days below the state median of 77. The longest season in the state is Chicago, 131 days, 76 miles southeast. The shortest is Woodstock at 65. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Greater Rockford Airport (11.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.