PaintDays

When to paint a house exterior in Longmont, CO

When to paint in Longmont, CO

Exterior painting here is a gamble in any month. The painting window is not reliable in any month, with 0 good months a year. The best month is June, at about 5 painting days.

If you cannot avoid the thin months, ask the painter for a low-temperature latex and watch the forecast for a dry run of 4 days before you commit. No month here reliably has the dry back-to-back days deck stain needs, so consider a solid stain or a sealer you can apply in shorter breaks.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 3May
  6. 5Jun
  7. 2Jul
  8. 4Aug
  9. 5Sep
  10. 1Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1120° / 51°F
Februaryunder 1under 1321° / 53°F
Marchunder 1under 1327° / 61°F
April111335° / 71°F
May312244° / 78°F
June541054° / 90°F
July2under 1259° / 95°F
August42557° / 93°F
September541549° / 88°F
October111737° / 74°F
November11326° / 60°F
Decemberunder 1under 1120° / 53°F

Deck stain does best in June. Low-temperature paint adds about 71 days a year here.

Towns near Longmont compared

6 of the 6 nearest places get more painting days, the most in Frederick (36 a year, 8 miles southeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom LongmontPainting days a yearWindowStation
Frederick, CO8 mi southeast36June to AugustErie Municipal Airport
Firestone, CO8 mi east36June to AugustErie Municipal Airport
Erie, CO9 mi south36June to AugustErie Municipal Airport
Berthoud, CO11 mi northeast30August to SeptemberFort Collins Loveland Airport
Lafayette, CO12 mi south36June to AugustErie Municipal Airport
Boulder, CO13 mi southwest36June to AugustErie Municipal Airport

How Longmont ranks in CO

Of 53 CO places with 10,000 people or more, Longmont (population 99,818, 13th largest) ranks 47th for painting days, 14 days below the state median of 36. The longest season in the state is Cañon City, 71 days, 119 miles south. The shortest is Glenwood Springs at 12. Switching to low-temperature paint here is worth 71 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Vance Brand Airport (3.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.