PaintDays

When to paint a house exterior in Laurel, MD

When to paint in Laurel, MD

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is June, at about 21 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. 2Mar
  4. 7Apr
  5. 13May
  6. 21Jun
  7. 19Jul
  8. 18Aug
  9. 15Sep
  10. 5Oct
  11. 2Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1327° / 43°F
Februaryunder 1under 1529° / 48°F
March221134° / 56°F
April751943° / 67°F
May13102152° / 73°F
June21212360° / 82°F
July19161966° / 87°F
August18151865° / 84°F
September15121859° / 78°F
October531747° / 68°F
November221036° / 57°F
Decemberunder 1under 1431° / 48°F

Deck stain does best in June. Low-temperature paint adds about 67 days a year here.

Towns near Laurel compared

5 of the 6 nearest places get more painting days, the most in Greenbelt (111 a year, 7 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Bowie is read from the same station as Laurel, so its numbers match; the real difference is the distance from that station.

PlaceFrom LaurelPainting days a yearWindowStation
Greenbelt, MD7 mi south111May to SeptemberCollege Park Airport
College Park, MD8 mi southwest111May to SeptemberCollege Park Airport
New Carrollton, MD9 mi south111May to SeptemberCollege Park Airport
Hyattsville, MD11 mi southwest111May to SeptemberCollege Park Airport
Takoma Park, MD11 mi southwest111May to SeptemberCollege Park Airport
Bowie, MD12 mi southeast101May to Septembersame station

How Laurel ranks in MD

Of 23 MD places with 10,000 people or more, Laurel (population 30,238, 10th largest) ranks 10th for painting days, 11 days above the state median of 90. The longest season in the state is Easton, 124 days, 48 miles southeast. The shortest is La Plata at 58. Switching to low-temperature paint here is worth 67 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Tipton (5.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.