PaintDays

When to paint a house exterior in Lansdowne, PA

When to paint in Lansdowne, PA

A normal season: plan the job, do not leave it late. The painting window is May to June, with 4 good months a year. The best month is September, at about 16 painting days. Book a painter by March.

If you want the house done in May to June, call for quotes in March or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 4Apr
  5. 12May
  6. 14Jun
  7. 8Jul
  8. 13Aug
  9. 16Sep
  10. 9Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1227° / 46°F
Februaryunder 1under 1329° / 50°F
Marchunder 1under 1735° / 57°F
April431644° / 68°F
May1281754° / 77°F
June14101463° / 86°F
July84871° / 91°F
August1391369° / 89°F
September16121663° / 83°F
October992051° / 72°F
November111439° / 60°F
Decemberunder 1under 1432° / 50°F

Deck stain does best in September. Low-temperature paint adds about 55 days a year here.

Towns near Lansdowne compared

1 gets fewer, down to 70 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Yeadon, Darby, Chester, Camden, Gloucester City are read from the same station as Lansdowne, so their numbers match; the real difference is the distance from that station.

PlaceFrom LansdownePainting days a yearWindowStation
Yeadon, PA1 mi southeast77May to Junesame station
Darby, PA2 mi southeast77May to Junesame station
Chester, PA8 mi southwest77May to Junesame station
Philadelphia, PA9 mi northeast70JuneNe Philadelphia Airport
Camden, NJ9 mi east77May to Junesame station
Gloucester City, NJ9 mi east77May to Junesame station

How Lansdowne ranks in PA

Of 68 PA places with 10,000 people or more, Lansdowne (population 11,225, 60th largest) ranks 21st for painting days, 13 days above the state median of 65. The longest season in the state is Indiana, 109 days, 210 miles west. The shortest is St. Marys at 39. Switching to low-temperature paint here is worth 55 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Philadelphia International Airport (5.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.