PaintDays

When to paint a house exterior in La Vergne, TN

When to paint in La Vergne, TN

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is September, at about 14 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 3Mar
  4. 6Apr
  5. 13May
  6. 11Jun
  7. 6Jul
  8. 12Aug
  9. 14Sep
  10. 10Oct
  11. 3Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1330° / 51°F
February11535° / 57°F
March331041° / 65°F
April641748° / 73°F
May13121858° / 81°F
June1191166° / 88°F
July63670° / 91°F
August12121268° / 89°F
September14141562° / 85°F
October1082050° / 76°F
November331039° / 63°F
Decemberunder 1under 1435° / 56°F

Deck stain does best in September. Low-temperature paint adds about 52 days a year here.

Towns near La Vergne compared

1 of the 6 nearest places get more painting days, the most in Nashville-Davidson (134 a year, 16 miles northwest); 2 get fewer, down to 65 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Smyrna, Nolensville, Murfreesboro are read from the same station as La Vergne, so their numbers match; the real difference is the distance from that station.

PlaceFrom La VergnePainting days a yearWindowStation
Smyrna, TN4 mi southeast79Maysame station
Nolensville, TN8 mi southwest79Maysame station
Brentwood, TN12 mi west65April to JuneNashville International Airport
Mount Juliet, TN13 mi north65April to JuneNashville International Airport
Murfreesboro, TN14 mi southeast79Maysame station
Nashville-Davidson, TN16 mi northwest134April to OctoberJohn C Tune

How La Vergne ranks in TN

Of 65 TN places with 10,000 people or more, La Vergne (population 41,430, 22nd largest) ranks 38th for painting days, 11 days below the state median of 90. The longest season in the state is Winchester, 154 days, 63 miles southeast. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 52 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Smyrna Airport (2.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.