PaintDays

When to paint a house exterior in Harlingen, TX

When to paint in Harlingen, TX

A normal season: plan the job, do not leave it late. The painting window is February to April, with 4 good months a year. The best month is March, at about 16 painting days. Book a painter by December.

If you want the house done in February to April, call for quotes in December or earlier; a job pushed past April is likely to wait until next year. For a deck, the months with enough staining days to spare are Jan, Feb, Mar, Apr, Oct, Nov, Dec.

  1. 9Jan
  2. 12Feb
  3. 16Mar
  4. 15Apr
  5. 5May
  6. 1Jun
  7. under 1Jul
  8. under 1Aug
  9. 2Sep
  10. 9Oct
  11. 16Nov
  12. 11Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January991951° / 73°F
February12111854° / 77°F
March16151862° / 83°F
April15111567° / 87°F
May53573° / 92°F
June1under 1175° / 95°F
Julyunder 1under 1under 176° / 96°F
Augustunder 1under 1under 176° / 98°F
September22273° / 94°F
October991166° / 88°F
November16161860° / 81°F
December11111955° / 76°F

Deck stain does best in November. Low-temperature paint adds about 28 days a year here.

Towns near Harlingen compared

3 of the 6 nearest places get more painting days, the most in Mercedes (109 a year, 14 miles west). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. San Benito, Raymondville are read from the same station as Harlingen, so their numbers match; the real difference is the distance from that station.

PlaceFrom HarlingenPainting days a yearWindowStation
San Benito, TX5 mi southeast96February to Aprilsame station
Mercedes, TX14 mi west109February to AprilMid Valley Airport
Weslaco, TX18 mi west109February to AprilMid Valley Airport
Brownsville, TX19 mi southeast98March to AprilBrownsville/S Padre Island In
Raymondville, TX20 mi north96February to Aprilsame station
Donna, TX21 mi west109February to AprilMid Valley Airport

How Harlingen ranks in TX

Of 252 TX places with 10,000 people or more, Harlingen (population 72,234, 57th largest) ranks 72nd for painting days, 7 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 285 miles northeast. The shortest is Town of Pecos at 38. Low-temperature paint only adds 28 days here, so the season is set by heat, rain or dew rather than cold nights.

Where these numbers come from

Daily records from Valley International Airport (3.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.