PaintDays

When to paint a house exterior in Guttenberg, NJ

When to paint in Guttenberg, NJ

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is September, at about 18 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 3Apr
  5. 13May
  6. 16Jun
  7. 12Jul
  8. 16Aug
  9. 18Sep
  10. 11Oct
  11. 3Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1328° / 43°F
Februaryunder 1under 1429° / 47°F
Marchunder 1under 1835° / 54°F
April321544° / 65°F
May1391654° / 75°F
June16131763° / 82°F
July1251270° / 88°F
August16101669° / 86°F
September18141863° / 80°F
October11101852° / 69°F
November331641° / 58°F
December1under 1734° / 49°F

Deck stain does best in September. Low-temperature paint adds about 58 days a year here.

Towns near Guttenberg compared

1 gets fewer, down to 71 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. West New York, Fairview, Cliffside Park, Union City, Edgewater are read from the same station as Guttenberg, so their numbers match; the real difference is the distance from that station.

PlaceFrom GuttenbergPainting days a yearWindowStation
West New York, NJ1 mi southwest92May to Septembersame station
Fairview, NJ2 mi north92May to Septembersame station
Cliffside Park, NJ2 mi northeast92May to Septembersame station
Union City, NJ2 mi southwest92May to Septembersame station
Edgewater, NJ3 mi northeast92May to Septembersame station
Ridgefield, NJ3 mi north71August to SeptemberTeterboro Airport

How Guttenberg ranks in NJ

Of 116 NJ places with 10,000 people or more, Guttenberg (population 11,945, 89th largest) ranks 7th for painting days, 21 days above the state median of 71. The longest season in the state is Union City, 92 days, 2 miles southwest. The shortest is Manville at 51. Switching to low-temperature paint here is worth 58 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Central Park (2.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.