PaintDays

When to paint a house exterior in Greenville, NC

When to paint in Greenville, NC

A long painting season, with room to reschedule. The painting window is April to June, with 6 good months a year. The best month is September, at about 20 painting days. Book a painter by February.

If you want the house done in April to June, call for quotes in February or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Jul, Aug, Sep, Oct.

  1. 1Jan
  2. 3Feb
  3. 7Mar
  4. 13Apr
  5. 18May
  6. 19Jun
  7. 8Jul
  8. 13Aug
  9. 20Sep
  10. 16Oct
  11. 3Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11733° / 54°F
February331137° / 61°F
March771942° / 67°F
April13132549° / 75°F
May18152359° / 82°F
June19191967° / 88°F
July86872° / 92°F
August1391370° / 90°F
September20192165° / 85°F
October16162753° / 76°F
November331641° / 66°F
December221136° / 58°F

Deck stain does best in September. Low-temperature paint adds about 75 days a year here.

Towns near Greenville compared

4 get fewer, down to 64 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Winterville, Kinston are read from the same station as Greenville, so their numbers match; the real difference is the distance from that station.

PlaceFrom GreenvillePainting days a yearWindowStation
Winterville, NC5 mi south123April to Junesame station
Tarboro, NC24 mi northwest80May to JuneTarboro Edgecombe Airport
Kinston, NC25 mi southwest123April to Junesame station
Wilson, NC33 mi west64April to JuneRocky Mount-Wilson Rgn Airport
Rocky Mount, NC35 mi northwest64April to JuneRocky Mount-Wilson Rgn Airport
Goldsboro, NC37 mi southwest75MaySeymour-Johnson Air Force Base Airport

How Greenville ranks in NC

Of 91 NC places with 10,000 people or more, Greenville (population 95,138, 11th largest) ranks 1st for painting days, 45 days above the state median of 77. No place in NC has a longer season. The shortest is Boone at 50. Switching to low-temperature paint here is worth 75 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Kinston Regional Jetport At S (24.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.