PaintDays

When to paint a house exterior in Great Falls, MT

When to paint in Great Falls, MT

Exterior painting here is a gamble in any month. The painting window is not reliable in any month, with 0 good months a year. The best month is August, at about 4 painting days.

If you cannot avoid the thin months, ask the painter for a low-temperature latex and watch the forecast for a dry run of 4 days before you commit. No month here reliably has the dry back-to-back days deck stain needs, so consider a solid stain or a sealer you can apply in shorter breaks.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. under 1Apr
  5. 1May
  6. 2Jun
  7. 4Jul
  8. 4Aug
  9. 3Sep
  10. 1Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1216° / 39°F
Februaryunder 1under 1213° / 36°F
Marchunder 1under 1421° / 49°F
Aprilunder 1under 1629° / 58°F
May1under 11338° / 68°F
June211746° / 79°F
July431251° / 89°F
August421350° / 88°F
September331843° / 76°F
October111132° / 61°F
Novemberunder 1under 1524° / 48°F
Decemberunder 1under 1317° / 39°F

Deck stain does best in September. Low-temperature paint adds about 88 days a year here.

Towns near Great Falls compared

1 of the 6 nearest places get more painting days, the most in Helena (26 a year, 71 miles southwest); 5 get fewer, down to 5 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom Great FallsPainting days a yearWindowStation
Helena, MT71 mi southwest26June to AugustHelena Regional Airport
Belgrade, MT119 mi south6none reliableGallatin Field Airport
Bozeman, MT126 mi south6none reliableGallatin Field Airport
Butte-Silver Bow, MT128 mi southwest5none reliableBert Mooney Airport
Missoula, MT135 mi west11none reliableMissoula International Airport
Kalispell, MT149 mi west10none reliableGlacier Park International Airport

How Great Falls ranks in MT

Of 8 MT places with 10,000 people or more, Great Falls (population 60,013, 3rd largest) ranks 3rd for painting days, 5 days above the state median of 10. The longest season in the state is Billings, 38 days, 176 miles southeast. The shortest is Butte-Silver Bow at 5. Switching to low-temperature paint here is worth 88 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Great Falls International Air (4.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.