PaintDays

When to paint a house exterior in Goodyear, AZ

When to paint in Goodyear, AZ

A normal season: plan the job, do not leave it late. The painting window is March to April, with 4 good months a year. The best month is March, at about 21 painting days. Book a painter by January.

If you want the house done in March to April, call for quotes in January or earlier; a job pushed past April is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Oct, Nov, Dec.

  1. 4Jan
  2. 10Feb
  3. 21Mar
  4. 18Apr
  5. 8May
  6. under 1Jun
  7. under 1Jul
  8. under 1Aug
  9. 2Sep
  10. 16Oct
  11. 17Nov
  12. 6Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January432943° / 67°F
February1072747° / 72°F
March21212953° / 79°F
April18161960° / 88°F
May85868° / 94°F
Juneunder 1under 1under 178° / 105°F
Julyunder 1under 1under 185° / 108°F
Augustunder 1under 1under 184° / 106°F
September21277° / 101°F
October16161663° / 89°F
November17162952° / 77°F
December662844° / 67°F

Deck stain does best in March. Low-temperature paint adds about 86 days a year here.

Towns near Goodyear compared

4 get fewer, down to 50 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Avondale is read from the same station as Goodyear, so its numbers match; the real difference is the distance from that station.

PlaceFrom GoodyearPainting days a yearWindowStation
Avondale, AZ5 mi northeast102March to Aprilsame station
Buckeye, AZ20 mi northwest73AprilBuckeye Municipal Airport
Glendale, AZ22 mi northeast102March to AprilGlendale Municipal Airport
El Mirage, AZ23 mi north55AprilLuke Air Force Base Airport
Maricopa, AZ26 mi southeast50March to MayCasa Grande Municipal Airport
Tempe, AZ27 mi east84March to AprilPhoenix Sky Harbor International Airport

How Goodyear ranks in AZ

Of 44 AZ places with 10,000 people or more, Goodyear (population 118,186, 11th largest) ranks 4th for painting days, 27 days above the state median of 75. The longest season in the state is Bullhead City, 124 days, 180 miles northwest. The shortest is Show Low at 15. Switching to low-temperature paint here is worth 86 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Phoenix Goodyear Airport (11.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.