PaintDays

When to paint a house exterior in Freeport, TX

When to paint in Freeport, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 16 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov, Dec.

  1. 3Jan
  2. 6Feb
  3. 10Mar
  4. 14Apr
  5. 14May
  6. 4Jun
  7. 1Jul
  8. 1Aug
  9. 6Sep
  10. 16Oct
  11. 11Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January331246° / 66°F
February661350° / 70°F
March10101657° / 76°F
April14121662° / 80°F
May14101470° / 86°F
June43474° / 91°F
July1under 1175° / 93°F
August1under 1175° / 94°F
September66672° / 90°F
October16141863° / 84°F
November11101755° / 75°F
December441251° / 71°F

Deck stain does best in October. Low-temperature paint adds about 39 days a year here.

Towns near Freeport compared

3 of the 6 nearest places get more painting days, the most in Galveston (133 a year, 29 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Clute, Lake Jackson, Angleton are read from the same station as Freeport, so their numbers match; the real difference is the distance from that station.

PlaceFrom FreeportPainting days a yearWindowStation
Clute, TX6 mi northwest91April to Maysame station
Lake Jackson, TX9 mi northwest91April to Maysame station
Angleton, TX16 mi north91April to Maysame station
Galveston, TX29 mi northeast133April to JuneScholes International At Glston Airport
Alvin, TX34 mi north108March to MayClover Field Airport
Santa Fe, TX34 mi northeast108March to MayClover Field Airport

How Freeport ranks in TX

Of 252 TX places with 10,000 people or more, Freeport (population 10,635, 238th largest) ranks 114th for painting days, 2 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 51 miles north. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 39 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Brazoria County Airport (13.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.