PaintDays

When to paint a house exterior in Frederick, MD

When to paint in Frederick, MD

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is August, at about 16 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 3Apr
  5. 6May
  6. 13Jun
  7. 10Jul
  8. 16Aug
  9. 15Sep
  10. 5Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1226° / 45°F
Februaryunder 1under 1329° / 51°F
March1under 1733° / 59°F
April331342° / 69°F
May641352° / 76°F
June1371560° / 85°F
July1031066° / 90°F
August1681664° / 87°F
September15121858° / 81°F
October541847° / 70°F
November1under 1734° / 58°F
Decemberunder 1under 1229° / 50°F

Deck stain does best in September. Low-temperature paint adds about 54 days a year here.

Towns near Frederick compared

2 get fewer, down to 63 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Gaithersburg, Rockville are read from the same station as Frederick, so their numbers match; the real difference is the distance from that station.

PlaceFrom FrederickPainting days a yearWindowStation
Hagerstown, MD22 mi northwest73August to SeptemberHgrtwn Rgnl-R.Hnson Field Airport
Gaithersburg, MD23 mi southeast70August to Septembersame station
Waynesboro, PA24 mi northwest73August to SeptemberHgrtwn Rgnl-R.Hnson Field Airport
Westminster, MD24 mi northeast63July to AugustYork Airport
Leesburg, VA24 mi south64JuneWashington Dulles Internation
Rockville, MD28 mi southeast70August to Septembersame station

How Frederick ranks in MD

Of 23 MD places with 10,000 people or more, Frederick (population 89,537, 2nd largest) ranks 17th for painting days, 21 days below the state median of 90. The longest season in the state is Easton, 124 days, 85 miles southeast. The shortest is La Plata at 58. Switching to low-temperature paint here is worth 54 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Gaithersburg Montgomery Count (22.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.