PaintDays

When to paint a house exterior in Franklin Town, MA

When to paint in Franklin Town, MA

A normal season: plan the job, do not leave it late. The painting window is June to August, with 3 good months a year. The best month is August, at about 17 painting days. Book a painter by April.

If you want the house done in June to August, call for quotes in April or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 13Jun
  7. 15Jul
  8. 17Aug
  9. 9Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 121° / 40°F
Februaryunder 1under 1121° / 42°F
Marchunder 1under 1328° / 49°F
April1under 1837° / 60°F
May521546° / 71°F
June1371755° / 79°F
July1581563° / 85°F
August17101761° / 83°F
September941654° / 76°F
October321244° / 66°F
November11633° / 55°F
Decemberunder 1under 1225° / 45°F

Deck stain does best in August. Low-temperature paint adds about 49 days a year here.

Towns near Franklin Town compared

1 gets fewer, down to 52 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Woonsocket, North Attleborough Town, Attleboro, Central Falls, Pawtucket are read from the same station as Franklin Town, so their numbers match; the real difference is the distance from that station.

PlaceFrom Franklin TownPainting days a yearWindowStation
Woonsocket, RI7 mi southwest62June to Augustsame station
North Attleborough Town, MA9 mi southeast62June to Augustsame station
Attleboro, MA12 mi southeast62June to Augustsame station
Central Falls, RI13 mi south62June to Augustsame station
Pawtucket, RI15 mi south62June to Augustsame station
Framingham, MA15 mi north52AugustLaurence G Hanscom Field Airport

How Franklin Town ranks in MA

Of 58 MA places with 10,000 people or more, Franklin Town (population 33,742, 42nd largest) ranks 23rd for painting days, 3 days above the state median of 60. The longest season in the state is Boston, 74 days, 27 miles northeast. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 49 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from North Central State Airport (12.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.