PaintDays

When to paint a house exterior in Fairview, TN

When to paint in Fairview, TN

A long painting season, with room to reschedule. The painting window is April to October, with 7 good months a year. The best month is May, at about 22 painting days. Book a painter by February.

If you want the house done in April to October, call for quotes in February or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Jul, Aug, Sep, Oct, Nov.

  1. 1Jan
  2. 3Feb
  3. 8Mar
  4. 13Apr
  5. 22May
  6. 19Jun
  7. 13Jul
  8. 16Aug
  9. 18Sep
  10. 15Oct
  11. 5Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11731° / 49°F
February321136° / 56°F
March882042° / 63°F
April13122648° / 72°F
May22222560° / 81°F
June19181966° / 87°F
July13111371° / 91°F
August16161669° / 88°F
September18182063° / 84°F
October15152652° / 74°F
November551739° / 61°F
December22936° / 54°F

Deck stain does best in May. Low-temperature paint adds about 74 days a year here.

Towns near Fairview compared

4 get fewer, down to 65 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Dickson, Nashville-Davidson are read from the same station as Fairview, so their numbers match; the real difference is the distance from that station.

PlaceFrom FairviewPainting days a yearWindowStation
Dickson, TN15 mi northwest134April to Octobersame station
Franklin, TN16 mi east65April to JuneNashville International Airport
Brentwood, TN20 mi east65April to JuneNashville International Airport
Spring Hill, TN20 mi southeast118May to SeptemberEllington
Nashville-Davidson, TN23 mi northeast134April to Octobersame station
Columbia, TN25 mi south111April to JuneMaury County Airport

How Fairview ranks in TN

Of 65 TN places with 10,000 people or more, Fairview (population 10,535, 62nd largest) ranks 16th for painting days, 44 days above the state median of 90. The longest season in the state is Winchester, 154 days, 79 miles southeast. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 74 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from John C Tune (19.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.