PaintDays

When to paint a house exterior in East Ridge, TN

When to paint in East Ridge, TN

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is May, at about 13 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 2Feb
  3. 2Mar
  4. 7Apr
  5. 13May
  6. 8Jun
  7. 2Jul
  8. 7Aug
  9. 13Sep
  10. 11Oct
  11. 3Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1332° / 55°F
February21536° / 61°F
March211243° / 69°F
April741749° / 76°F
May13101759° / 84°F
June85867° / 90°F
July2under 1271° / 93°F
August75770° / 91°F
September13131364° / 88°F
October11102152° / 78°F
November331341° / 67°F
December1under 1537° / 59°F

Deck stain does best in September. Low-temperature paint adds about 54 days a year here.

Towns near East Ridge compared

Every one of the 6 closest places lands within three days of East Ridge's 68 a year, so the season here is the regional season. Fort Oglethorpe, Chattanooga, Red Bank, Collegedale, Soddy-Daisy, Dalton are read from the same station as East Ridge, so their numbers match; the real difference is the distance from that station.

PlaceFrom East RidgePainting days a yearWindowStation
Fort Oglethorpe, GA5 mi south68Maysame station
Chattanooga, TN5 mi north68Maysame station
Red Bank, TN9 mi northwest68Maysame station
Collegedale, TN11 mi east68Maysame station
Soddy-Daisy, TN19 mi north68Maysame station
Dalton, GA21 mi southeast68Maysame station

How East Ridge ranks in TN

Of 65 TN places with 10,000 people or more, East Ridge (population 21,970, 31st largest) ranks 52nd for painting days, 22 days below the state median of 90. The longest season in the state is Winchester, 154 days, 51 miles west. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 54 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Lovell Field Airport (3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.