PaintDays

When to paint a house exterior in East Orange, NJ

When to paint in East Orange, NJ

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 17 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 3Apr
  5. 10May
  6. 13Jun
  7. 8Jul
  8. 12Aug
  9. 17Sep
  10. 9Oct
  11. 2Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1126° / 45°F
Februaryunder 1under 1227° / 48°F
Marchunder 1under 1634° / 56°F
April321544° / 66°F
May1071554° / 77°F
June13101363° / 85°F
July84870° / 91°F
August1271268° / 88°F
September17121861° / 82°F
October981950° / 71°F
November221338° / 60°F
Decemberunder 1under 1432° / 50°F

Deck stain does best in September. Low-temperature paint adds about 52 days a year here.

Towns near East Orange compared

Every one of the 6 closest places lands within three days of East Orange's 74 a year, so the season here is the regional season. Harrison, Newark, Kearny, Elizabeth are read from the same station as East Orange, so their numbers match; the real difference is the distance from that station.

PlaceFrom East OrangePainting days a yearWindowStation
Harrison, NJ3 mi southeast74August to Septembersame station
Newark, NJ3 mi southeast74August to Septembersame station
North Arlington, NJ5 mi east71August to SeptemberTeterboro Airport
Kearny, NJ5 mi east74August to Septembersame station
Rutherford, NJ7 mi northeast71August to SeptemberTeterboro Airport
Elizabeth, NJ7 mi south74August to Septembersame station

How East Orange ranks in NJ

Of 116 NJ places with 10,000 people or more, East Orange (population 71,850, 8th largest) ranks 45th for painting days, 3 days above the state median of 71. The longest season in the state is Union City, 92 days, 9 miles east. The shortest is Manville at 51. Switching to low-temperature paint here is worth 52 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Newark Liberty International (6.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.