PaintDays

When to paint a house exterior in East Moline, IL

When to paint in East Moline, IL

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 18 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 2Apr
  5. 7May
  6. 9Jun
  7. 15Jul
  8. 18Aug
  9. 13Sep
  10. 5Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 116° / 35°F
Februaryunder 1under 1117° / 41°F
March1under 1430° / 55°F
April221039° / 66°F
May761551° / 77°F
June961061° / 87°F
July15101564° / 88°F
August18141861° / 86°F
September13111856° / 83°F
October541543° / 69°F
November11631° / 54°F
Decemberunder 1under 1124° / 43°F

Deck stain does best in August. Low-temperature paint adds about 44 days a year here.

Towns near East Moline compared

2 of the 6 nearest places get more painting days, the most in Bettendorf (86 a year, 6 miles northwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Moline, Rock Island are read from the same station as East Moline, so their numbers match; the real difference is the distance from that station.

PlaceFrom East MolinePainting days a yearWindowStation
Bettendorf, IA6 mi northwest86June to SeptemberDavenport Municipal Airpt
Moline, IL6 mi southwest70July to Septembersame station
Rock Island, IL11 mi west70July to Septembersame station
Davenport, IA11 mi west86June to SeptemberDavenport Municipal Airpt
Clinton, IA24 mi north71June to AugustClinton Municipal Airport
Kewanee, IL31 mi southeast71June to SeptemberGalesburg Municipal Airport

How East Moline ranks in IL

Of 225 IL places with 10,000 people or more, East Moline (population 20,995, 117th largest) ranks 203rd for painting days, 7 days below the state median of 77. The longest season in the state is Chicago, 131 days, 141 miles east. The shortest is Woodstock at 65. Switching to low-temperature paint here is worth 44 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Quad City International Airport (8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.