PaintDays

When to paint a house exterior in Conneaut, OH

When to paint in Conneaut, OH

A short season: book early and expect weather delays. The painting window is July to August, with 2 good months a year. The best month is July, at about 18 painting days. Book a painter by May.

If you want the house done in July to August, call for quotes in May or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 5May
  6. 10Jun
  7. 18Jul
  8. 16Aug
  9. 11Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1120° / 37°F
Februaryunder 1under 1121° / 41°F
Marchunder 1under 1227° / 49°F
April22736° / 61°F
May551647° / 73°F
June1081656° / 80°F
July18141960° / 84°F
August16121859° / 82°F
September11101754° / 78°F
October331244° / 66°F
November11733° / 53°F
Decemberunder 1under 1228° / 43°F

Deck stain does best in July. Low-temperature paint adds about 51 days a year here.

Towns near Conneaut compared

4 of the 6 nearest places get more painting days, the most in Painesville (126 a year, 38 miles west). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Ashtabula is read from the same station as Conneaut, so its numbers match; the real difference is the distance from that station.

PlaceFrom ConneautPainting days a yearWindowStation
Ashtabula, OH12 mi west67July to Augustsame station
Erie, PA29 mi northeast85June to SeptemberErie International/T. Ridge Field Airport
Meadville, PA29 mi southeast67July to SeptemberPort Meadville Airport
Painesville, OH38 mi west126May to OctoberFairport
Mentor, OH43 mi west84June to SeptemberWilloughby Lost Nation Municipal
Willoughby, OH48 mi southwest84June to SeptemberWilloughby Lost Nation Municipal

How Conneaut ranks in OH

Of 176 OH places with 10,000 people or more, Conneaut (population 12,357, 150th largest) ranks 147th for painting days, 9 days below the state median of 76. The longest season in the state is Euclid, 156 days, 54 miles southwest. The shortest is Reading at 59. Switching to low-temperature paint here is worth 51 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Ashtabula County Airport (12.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.