PaintDays

When to paint a house exterior in Columbus, IN

When to paint in Columbus, IN

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 17 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 1Mar
  4. 3Apr
  5. 9May
  6. 11Jun
  7. 13Jul
  8. 17Aug
  9. 13Sep
  10. 7Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1123° / 41°F
February11325° / 47°F
March11534° / 58°F
April331242° / 69°F
May961554° / 80°F
June1181162° / 87°F
July1381366° / 88°F
August17121763° / 86°F
September1391757° / 84°F
October761846° / 73°F
November11734° / 58°F
Decemberunder 1under 1229° / 48°F

Deck stain does best in August. Low-temperature paint adds about 45 days a year here.

Towns near Columbus compared

2 of the 6 nearest places get more painting days, the most in Bargersville (85 a year, 28 miles northwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Franklin, Greensburg, Shelbyville are read from the same station as Columbus, so their numbers match; the real difference is the distance from that station.

PlaceFrom ColumbusPainting days a yearWindowStation
Seymour, IN18 mi south74June to SeptemberMonroe County Airport
Franklin, IN21 mi north75July to Septembersame station
Greensburg, IN25 mi northeast75July to Septembersame station
Shelbyville, IN25 mi north75July to Septembersame station
Bargersville, IN28 mi northwest85June to SeptemberIndianapolis International Airport
Greenwood, IN29 mi north85June to SeptemberIndianapolis International Airport

How Columbus ranks in IN

Of 88 IN places with 10,000 people or more, Columbus (population 51,970, 20th largest) ranks 42nd for painting days, right at the state median of 75. The longest season in the state is Michigan City, 134 days, 180 miles north. The shortest is McCordsville at 59. Switching to low-temperature paint here is worth 45 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Shelbyville Minucipal Airport (26.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.