PaintDays

When to paint a house exterior in Chestnut Ridge, NY

When to paint in Chestnut Ridge, NY

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 16 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 9May
  6. 14Jun
  7. 10Jul
  8. 13Aug
  9. 16Sep
  10. 6Oct
  11. 2Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1125° / 44°F
Februaryunder 1under 1226° / 47°F
Marchunder 1under 1533° / 54°F
April221342° / 65°F
May971552° / 76°F
June14101561° / 84°F
July1061069° / 90°F
August1381367° / 88°F
September16141860° / 82°F
October651848° / 71°F
November211037° / 59°F
Decemberunder 1under 1230° / 49°F

Deck stain does best in September. Low-temperature paint adds about 49 days a year here.

Towns near Chestnut Ridge compared

2 get fewer, down to 65 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Airmont, Hillsdale, Waldwick are read from the same station as Chestnut Ridge, so their numbers match; the real difference is the distance from that station.

PlaceFrom Chestnut RidgePainting days a yearWindowStation
Spring Valley, NY2 mi north70June to SeptemberWestchester County Airport
Airmont, NY3 mi west71August to Septembersame station
Suffern, NY5 mi west65August to SeptemberEssex County Airport
Hillsdale, NJ5 mi south71August to Septembersame station
Ramsey, NJ5 mi west65August to SeptemberEssex County Airport
Waldwick, NJ6 mi southwest71August to Septembersame station

How Chestnut Ridge ranks in NY

Of 90 NY places with 10,000 people or more, Chestnut Ridge (population 10,746, 81st largest) ranks 33rd for painting days, 1 day above the state median of 70. The longest season in the state is Kingston, 96 days, 58 miles north. The shortest is Olean at 39. Switching to low-temperature paint here is worth 49 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Teterboro Airport (16.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.