When to paint a house exterior in Chaska, MN

When to paint in Chaska, MN

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is July, at about 17 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 9May
  6. 14Jun
  7. 17Jul
  8. 17Aug
  9. 15Sep
  10. 6Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 111° / 26°F
Februaryunder 1under 1111° / 29°F
Marchunder 1under 1426° / 44°F
April211137° / 57°F
May981751° / 73°F
June1491562° / 83°F
July17121765° / 85°F
August17111763° / 82°F
September15141957° / 77°F
October661543° / 61°F
November11630° / 45°F
Decemberunder 1under 1under 118° / 32°F

Deck stain does best in September. Low-temperature paint adds about 42 days a year here.

Towns near Chaska compared

1 gets fewer, down to 69 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Chanhassen, Victoria, Shakopee, Eden Prairie, Prior Lake are read from the same station as Chaska, so their numbers match; the real difference is the distance from that station.

PlaceFrom ChaskaPainting days a yearWindowStation
Chanhassen, MN4 mi northeast80June to Septembersame station
Victoria, MN5 mi northwest80June to Septembersame station
Shakopee, MN7 mi southeast80June to Septembersame station
Eden Prairie, MN8 mi east80June to Septembersame station
Waconia, MN9 mi west69June to SeptemberGlencoe Municipal Airport
Prior Lake, MN10 mi southeast80June to Septembersame station

How Chaska ranks in MN

Of 103 MN places with 10,000 people or more, Chaska (population 30,167, 35th largest) ranks 20th for painting days, 7 days above the state median of 73. The longest season in the state is Owatonna, 100 days, 53 miles south. The shortest is Hibbing at 23. Switching to low-temperature paint here is worth 42 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Flying Cloud Airport (6.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.