PaintDays

When to paint a house exterior in Charlotte, NC

When to paint in Charlotte, NC

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is September, at about 14 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Sep, Oct.

  1. 1Jan
  2. 2Feb
  3. 4Mar
  4. 8Apr
  5. 13May
  6. 11Jun
  7. 3Jul
  8. 7Aug
  9. 14Sep
  10. 10Oct
  11. 2Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1332° / 56°F
February21737° / 62°F
March441342° / 69°F
April861949° / 77°F
May1391758° / 83°F
June1191166° / 90°F
July31370° / 93°F
August74769° / 91°F
September14131563° / 86°F
October1092251° / 78°F
November221140° / 67°F
December11636° / 60°F

Deck stain does best in September. Low-temperature paint adds about 57 days a year here.

Towns near Charlotte compared

3 of the 6 nearest places get more painting days, the most in Matthews (79 a year, 9 miles southeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Pineville, Belmont, Mount Holly are read from the same station as Charlotte, so their numbers match; the real difference is the distance from that station.

PlaceFrom CharlottePainting days a yearWindowStation
Pineville, NC9 mi southwest75Maysame station
Matthews, NC9 mi southeast79MayMonroe Airport
Mint Hill, NC10 mi east79MayMonroe Airport
Stallings, NC12 mi southeast79MayMonroe Airport
Belmont, NC12 mi west75Maysame station
Mount Holly, NC12 mi northwest75Maysame station

How Charlotte ranks in NC

Of 91 NC places with 10,000 people or more, Charlotte (population 943,476, 1st largest) ranks 55th for painting days, 3 days below the state median of 77. The longest season in the state is Greenville, 123 days, 196 miles east. The shortest is Boone at 50. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Charlotte/Douglas Internation (7.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.