A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 17 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 2Jan
  2. 6Feb
  3. 9Mar
  4. 15Apr
  5. 14May
  6. 6Jun
  7. 1Jul
  8. 3Aug
  9. 10Sep
  10. 17Oct
  11. 6Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221240° / 66°F
February651544° / 71°F
March991949° / 77°F
April15132155° / 81°F
May14121663° / 87°F
June66670° / 92°F
July11174° / 94°F
August33373° / 93°F
September1091069° / 89°F
October17172259° / 83°F
November661849° / 74°F
December221044° / 69°F

Deck stain does best in October. Low-temperature paint adds about 61 days a year here.

Towns near Bluffton compared

Every one of the 6 closest places lands within three days of Bluffton's 91 a year, so the season here is the regional season. Hardeeville, Port Wentworth, Garden City, Rincon are read from the same station as Bluffton, so their numbers match; the real difference is the distance from that station.

PlaceFrom BlufftonPainting days a yearWindowStation
Hardeeville, SC9 mi northwest91April to Maysame station
Hilton Head Island, SC11 mi east88April to MayBeaufort Mcas
Port Wentworth, GA16 mi west91April to Maysame station
Port Royal, SC17 mi northeast88April to MayBeaufort Mcas
Garden City, GA17 mi southwest91April to Maysame station
Rincon, GA19 mi west91April to Maysame station

How Bluffton ranks in SC

Of 42 SC places with 10,000 people or more, Bluffton (population 36,146, 16th largest) ranks 15th for painting days, 9 days above the state median of 82. The longest season in the state is Myrtle Beach, 122 days, 157 miles northeast. The shortest is Tega Cay at 68. Switching to low-temperature paint here is worth 61 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Savannah/Hilton Head International Air (16.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.