PaintDays

When to paint a house exterior in Bel Air, MD

When to paint in Bel Air, MD

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is June, at about 19 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 5Apr
  5. 13May
  6. 19Jun
  7. 15Jul
  8. 16Aug
  9. 16Sep
  10. 6Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1226° / 44°F
Februaryunder 1under 1327° / 49°F
March1under 1733° / 57°F
April541642° / 68°F
May1392153° / 76°F
June19132160° / 84°F
July15101568° / 89°F
August1691665° / 86°F
September16101959° / 80°F
October631847° / 70°F
November11735° / 59°F
Decemberunder 1under 1429° / 49°F

Deck stain does best in June. Low-temperature paint adds about 57 days a year here.

Towns near Bel Air compared

4 get fewer, down to 61 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Aberdeen, Havre de Grace are read from the same station as Bel Air, so their numbers match; the real difference is the distance from that station.

PlaceFrom Bel AirPainting days a yearWindowStation
Aberdeen, MD9 mi east90May to Septembersame station
Havre de Grace, MD12 mi east90May to Septembersame station
Baltimore, MD22 mi southwest61SeptemberBaltimore-Washington International Air
Elkton, MD28 mi east71August to SeptemberNew Castle County Airport
Newark, DE33 mi east71August to SeptemberNew Castle County Airport
Middletown, DE34 mi east71August to SeptemberNew Castle County Airport

How Bel Air ranks in MD

Of 23 MD places with 10,000 people or more, Bel Air (population 10,395, 23rd largest) ranks 13th for painting days, right at the state median of 90. The longest season in the state is Easton, 124 days, 54 miles south. The shortest is La Plata at 58. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Phillips Army Airfield (10.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.