PaintDays

When to paint a house exterior in Beavercreek, OH

When to paint in Beavercreek, OH

A normal season: plan the job, do not leave it late. The painting window is July to September, with 3 good months a year. The best month is August, at about 16 painting days. Book a painter by May.

If you want the house done in July to September, call for quotes in May or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 8May
  6. 12Jun
  7. 14Jul
  8. 16Aug
  9. 13Sep
  10. 5Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 122° / 41°F
Februaryunder 1under 1125° / 46°F
Marchunder 1under 1432° / 56°F
April21940° / 67°F
May841452° / 77°F
June1291459° / 84°F
July1461464° / 87°F
August16121662° / 85°F
September13111857° / 82°F
October531545° / 70°F
November11533° / 56°F
Decemberunder 1under 1228° / 47°F

Deck stain does best in August. Low-temperature paint adds about 43 days a year here.

Towns near Beavercreek compared

3 of the 6 nearest places get more painting days, the most in Dayton (81 a year, 8 miles northwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Riverside, Fairborn, Xenia are read from the same station as Beavercreek, so their numbers match; the real difference is the distance from that station.

PlaceFrom BeavercreekPainting days a yearWindowStation
Riverside, OH5 mi northwest70July to Septembersame station
Fairborn, OH5 mi northeast70July to Septembersame station
Kettering, OH5 mi southwest78June to SeptemberDayton-Wright Brothers Airport
Xenia, OH7 mi southeast70July to Septembersame station
Centerville, OH8 mi southwest78June to SeptemberDayton-Wright Brothers Airport
Dayton, OH8 mi northwest81June to SeptemberJ.M.Cox Dayton International

How Beavercreek ranks in OH

Of 176 OH places with 10,000 people or more, Beavercreek (population 48,012, 21st largest) ranks 131st for painting days, 6 days below the state median of 76. The longest season in the state is Euclid, 156 days, 185 miles northeast. The shortest is Reading at 59. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Wright-Patterson Air Force Base Airport (6.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.