PaintDays

When to paint a house exterior in Atoka, TN

When to paint in Atoka, TN

A long painting season, with room to reschedule. The painting window is April to June, with 6 good months a year. The best month is May, at about 26 painting days. Book a painter by February.

If you want the house done in April to June, call for quotes in February or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Jul, Aug, Sep, Oct, Nov.

  1. 1Jan
  2. 3Feb
  3. 9Mar
  4. 14Apr
  5. 26May
  6. 16Jun
  7. 11Jul
  8. 15Aug
  9. 19Sep
  10. 18Oct
  11. 6Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11831° / 50°F
February331336° / 57°F
March992444° / 66°F
April14142751° / 72°F
May26262961° / 81°F
June16151669° / 89°F
July1191173° / 91°F
August15151570° / 90°F
September19191965° / 86°F
October18182853° / 76°F
November661842° / 63°F
December221137° / 55°F

Deck stain does best in May. Low-temperature paint adds about 78 days a year here.

Towns near Atoka compared

1 gets fewer, down to 125 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Millington, Lakeland, Bartlett, Arlington, Oakland are read from the same station as Atoka, so their numbers match; the real difference is the distance from that station.

PlaceFrom AtokaPainting days a yearWindowStation
Millington, TN9 mi southwest139April to Junesame station
Lakeland, TN12 mi south139April to Junesame station
Bartlett, TN13 mi south139April to Junesame station
Arlington, TN14 mi southeast139April to Junesame station
Oakland, TN20 mi southeast139April to Junesame station
Germantown, TN24 mi south125April to JuneOlive Branch Airport

How Atoka ranks in TN

Of 65 TN places with 10,000 people or more, Atoka (population 10,624, 61st largest) ranks 10th for painting days, 49 days above the state median of 90. The longest season in the state is Winchester, 154 days, 208 miles east. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 78 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Millington Municipal Airport (7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.