When to paint a house exterior in Arlington Heights, IL
When to paint in Arlington Heights, IL
A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is August, at about 18 painting days. Book a painter by April.
If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.
- under 1Jan
- under 1Feb
- under 1Mar
- 2Apr
- 8May
- 14Jun
- 16Jul
- 18Aug
- 16Sep
- 6Oct
- 1Nov
- under 1Dec
Month by month
| Month | Painting days | Staining days | With low-temp paint | Avg low / high |
|---|---|---|---|---|
| January | under 1 | under 1 | 1 | 21° / 34°F |
| February | under 1 | under 1 | 2 | 21° / 38°F |
| March | under 1 | under 1 | 5 | 31° / 49°F |
| April | 2 | 2 | 11 | 40° / 60°F |
| May | 8 | 7 | 15 | 51° / 72°F |
| June | 14 | 11 | 15 | 61° / 82°F |
| July | 16 | 10 | 16 | 66° / 85°F |
| August | 18 | 15 | 18 | 65° / 84°F |
| September | 16 | 13 | 18 | 60° / 78°F |
| October | 6 | 6 | 16 | 47° / 65°F |
| November | 1 | 1 | 9 | 35° / 51°F |
| December | under 1 | under 1 | 3 | 27° / 41°F |
Deck stain does best in August. Low-temperature paint adds about 48 days a year here.
Towns near Arlington Heights compared
Every one of the 6 closest places lands within three days of Arlington Heights's 80 a year, so the season here is the regional season. Rolling Meadows, Prospect Heights, Mount Prospect, Palatine, Wheeling, Buffalo Grove are read from the same station as Arlington Heights, so their numbers match; the real difference is the distance from that station.
| Place | From Arlington Heights | Painting days a year | Window | Station |
|---|---|---|---|---|
| Rolling Meadows, IL | 3 mi southwest | 80 | June to September | same station |
| Prospect Heights, IL | 3 mi east | 80 | June to September | same station |
| Mount Prospect, IL | 3 mi southeast | 80 | June to September | same station |
| Palatine, IL | 3 mi west | 80 | June to September | same station |
| Wheeling, IL | 4 mi northeast | 80 | June to September | same station |
| Buffalo Grove, IL | 5 mi north | 80 | June to September | same station |
How Arlington Heights ranks in IL
Of 225 IL places with 10,000 people or more, Arlington Heights (population 75,596, 15th largest) ranks 58th for painting days, 3 days above the state median of 77. The longest season in the state is Chicago, 131 days, 24 miles southeast. The shortest is Woodstock at 65. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.
Where these numbers come from
Daily records from Palwaukee Municipal Airport (4.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.